IJSTR

International Journal of Scientific & Technology Research

IJSTR@Facebook IJSTR@Twitter IJSTR@Linkedin
Home About Us Scope Editorial Board Blog/Latest News Contact Us
Scopus/Elsevier
CALL FOR PAPERS
AUTHORS
DOWNLOADS
CONTACT
QR CODE
IJSTR-QR Code

IJSTR >> Volume 7 - Issue 2, February 2018 Edition



International Journal of Scientific & Technology Research  
International Journal of Scientific & Technology Research

Website: http://www.ijstr.org

ISSN 2277-8616



The Value Analysis Of Bca Branch Office Project In Malang

[Full Text]

 

AUTHOR(S)

Hernawan Budisampurno, Kustamar, Tiong Iskandar

 

KEYWORDS

Concrete structure, Branch Office , Project

 

ABSTRACT

The object of research is on concrete structure , new 6 story branch office in Malang on 2695 square metre area, owned by Bank Central Asia . The aim of this research are namely: 1) to analyze the type of right structure on the object in accordance with the reviewed aspects, 2) to determine the amount of cost saving and its percentage after value engineering to be applied. This research examines how to obtain optimal structure alternatives by apllying Value engineering, in an effort to obtain chosen effective , stabil and optimal type of structure but it is still in good quality. On the preparation before researching is to collect or even to search data in relevance with project, both from owner and consultant as well. After that to survey and observe the location of project to obtain the general condition on site.

 

REFERENCES

[1] Wei-Yen, D. H. (Ed.). (2005). Roadmap to an ASEAN economic community. Institute of Southeast Asian Studies.

[2] Lane, T. D. (1993). Market discipline. Staff Papers, 40(1), 53-88.

[3] Zhang, H. Q., Wang, F., & zhang, W. C. (2005). Study on bid tactics with game theory under the working model of bill of quantity [J]. Journal of Hehai University (Natural Sciences), 5, 026.

[4] Miller, R., & Lessard, D. (2001). Understanding and managing risks in large engineering projects. International Journal of Project Management, 19(8), 437-443.

[5] Kaka, A., & Price, A. D. (1991). Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), 383-400.

[6] Cooper, R. (2017). Target costing and value engineering. Routledge.

[7] Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of delay in large building construction projects. Journal of management in engineering, 11(2), 45-50.

[8] Boussabaine, A. (2013). Cost planning of PFI and PPP building projects. Routledge.

[9] Josephson, P. E., & Hammarlund, Y. (1999). The causes and costs of defects in construction: A study of seven building projects. Automation in construction, 8(6), 681-687.