IJSTR

International Journal of Scientific & Technology Research

IJSTR@Facebook IJSTR@Twitter IJSTR@Linkedin
Home About Us Scope Editorial Board Blog/Latest News Contact Us
CALL FOR PAPERS
AUTHORS
DOWNLOADS
CONTACT
QR CODE
IJSTR-QR Code

IJSTR >> Volume 2- Issue 7, July 2013 Edition



International Journal of Scientific & Technology Research  
International Journal of Scientific & Technology Research

Website: http://www.ijstr.org

ISSN 2277-8616



Single/Multiple Transaction ATC Determination For Intact/Contingency Cases Using Sensitivity Factors

[Full Text]

 

AUTHOR(S)

Naresh K. Yadav, Prashant Sharma

 

KEYWORDS

Keywords: Available Transfer Capability (ATC), DC Power Flow, DC Power Transfer Distribution Factors (DCPTDFs), Line Outage Distribution Factors (LODFs), and Generator Outage Distribution Factors (GODFs).

 

ABSTRACT

Abstract: Due to the Deregulation of electricity industry, the competition is growing day by day between the Generators as well as in Distributors. But due to the competition in electricity market, it may cause congestion in the transmission lines and can cause black out in any area. This will affect not only the generation of electricity but also the consumers. To avoid this problem, in competitive electricity market it is very necessary to post the available transfer capability of a transmission network online, so that everyone can excess it and the congestion can be avoided. In this paper DC Power flow and power transfer distribution factors are used to calculate the available transfer capability of the network. The method used in this paper can be used for multiple as well as single transactions. In this paper some transactions are chosen and available transfer capability for both intact and contingency cases are calculated. The above said methodology is applied on IEEE 30-bus test system.

 

REFERENCES

[1] Federal Energy Regulatory Commission (FERC), “Regional Transmission Organizations”, Washington, DC, Docket RM99-2-000, order 2000, Dec. 20, 1999.

[2] http://www.oasis.oati.com/wasn/index.html.

[3] North American Electric Reliability Council (NERC), “Available Transfer Capability Definitions and Determination”, NERC Report, June 1996.

[4] M. Shaaban, Y. Ni, H. Dai and F. Wu, “Considerations in Calculating Total Transfer Capability”, Proc. Of the International Conference on Power System Technology, Beijing, Vol. 2, pp. 1356-1360, August 1998.

[5] Gravener, M., Nwankpa, H. C., & Yeoh, T., “ATC Computational Issues”, InternationalConference on Power System, Hawaii, pp. 1-6, 1999.

[6] V. Ajjarappu and C. Christy, “The Continuation Power Flow: A Tool for Steady State Voltage Stability Analysis”, IEEE Trans. on Power Systems, vol. 7, no. 1, pp. 416-423, Feb. 1992.

[7] Hur, D. P., Kim, J. K., B, H, & Son, K. M., “Security Constrained Optimal Power Flow for the Evaluation of Transmission Capability on Electric Power System”, 2001.

[8] Venkatesh, P., R, G., & Prasad, P.,“Available Transfer Capability Determination Using Power Distribution Factors”, Journal of Emerging Electric Power Systems, Article 1009, 2004

[9] Kumar, A., Srivastava, S. C., & Singh, S. N., “Available Transfer Capability (ATC) Determination in a Competitive Electricity Market Using AC Distribution Factors”,Electric Power Components and Systems, 32 (9), pp. 927-939, 2004.

[10] Wood and B.F. Wollenberg, "Power Generation, Operation and Control", John Wiley, New York, 1996.

[11] B.V.Manikandan, S. Charles Raja, P.Venkatesh and P.S. Kannan, "Available Transfer Capability Determination in the Restructured Electricity Market", Electric Power Component and Systems, Taylor and Francis, 2008.