IJSTR

International Journal of Scientific & Technology Research

Home About Us Scope Editorial Board Blog/Latest News Contact Us
0.2
2019CiteScore
 
10th percentile
Powered by  Scopus
Scopus coverage:
Nov 2018 to May 2020

CALL FOR PAPERS
AUTHORS
DOWNLOADS
CONTACT

IJSTR >> Volume 8 - Issue 8, August 2019 Edition



International Journal of Scientific & Technology Research  
International Journal of Scientific & Technology Research

Website: http://www.ijstr.org

ISSN 2277-8616



Early Contractor Involvement (ECI): Indian Scenario Of Construction Project Delivery

[Full Text]

 

AUTHOR(S)

Siddhesh Sagvekar, Dr. A. S. Wayal

 

KEYWORDS

Alliance, Construction Management at Risk, Design-Build, Early Contractor Involvement, Project delivery, Risk management, Swiss Challenge Method

 

ABSTRACT

In recent years, for various complicated projects, early contractor involvement (ECI) is rising as a new project delivery methodology. Different project delivery strategies are like Design-Build (DB), Construction Management in danger (CMR), Alliance and Swiss challenge method and the selection of most appropriate project delivery method is dependent on number factors and project requirements for a particular project. Cases of Bandra-Worli Sea link project and Dharavi Redevelopment proposed project are reviewed to understand various risks and need of ECI. Questionnaire surveys with industry experts are conducted to obtain opinions regarding the various circumstances for early contractor involvement. Various problems identified from questionnaire responses are grouped into risk distribution issues, cost issues, time issues and quality issues. The study is focussed mainly on different government and semi-government authorities in Mumbai and Thane region from Maharashtra, India. The study identified some circumstances wherein Early Contractor Involvement can be beneficial and if well planned for ensure innovation and strong professional relationships, early contractor involvement could be a procurement approach which will and lead to economical designing and construction processes.

 

REFERENCES

[1] B. Koncarevic, “The Performance of Early Contractor Involvement Contracts”, School of Civil Engineering and Built Environment, Queensland University of Technology, Australia.
[2] D. Mosey, “Early Contractor Involvement in Building Procurement”, ISBN 9781444309874, Blackwell, Chichester, 2009.
[3] Dr. V. Podile N. J. Rao, “Swiss Challenge Method – An Innovative Public Private Partnership Model in India”, Asian Journal of Research in Business Economics and Management Vol. 7, No. 7, July 2017, pp. 384-390.
[4] E. Scheepbouwer, A. B. Humphries, “Transition in Adopting Project Delivery Method with Early Contractor Involvement”, Transportation Research Record: Journal of the Transportation Research Board, December 2011, No. 2228, pp. 44-50, Transportation Research Board of the National Academies, Washington.
[5] E.D. Love Peter, D. O’Donoghue., J. Smith, “Procurement of public sector facilities: Views of early contractor involvement”, Vol. 32, Issue: 9/10, pp.460-471, 2014.
[6] F. Rahmani, M. M. A. Khalfan, T. Maqsood, “The Use of Early Contractor Involvement in Different Countries”, RMIT University, March 2016.
[7] I. M. Mahdi, K. Alreshaid, “Decision Support System for Selecting the Proper Project Delivery Method Using Analytical Hierarchy Process (AHP)”, International Journal of Procurement Management, 24 May 2005, pp. 564-572, Elsevier.
[8] L. Song, Y. Mohamed, S. M. Abourizk, “Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance”, Journal of Management in Engineering, January 1, 2009, Vol. 25, No. 1, ISSN 0742-597X/2009/1-12–20, ASCE.
[9] M. Rahman, A. Alhassan, “A Contractor's Perception on Early Contractor Involvement”, Built Environment Project and Asset Management, 2012, Vol. 2, ISS 2 pp. 217-233, Emerald.
[10] P. A. Wondimu, E. Hailemichael, A. Hosseini, J. Lohne, O. Torp, O. Lædre, “Success Factors for Early Contractor Involvement (ECI) in Public Infrastructure Projects”, SBE16 Tallinn and Helsinki Conference; Build Green and Renovate Deep, 5-7 October 2016, Energy Procedia 96 ( 2016 ) 845 – 854, Elsevier.
[11] R. Eadie, M. Graham, “Analysing the Advantages of Early Contractor Involvement”, International Journal of Procurement Management, Vol.7, No.6, 2014.
[12] Y. Salamah, “Alliance Contracting Models in Construction Projects: Leadership and Management”, Master thesis-International Master of Science in Construction and Real Estate Management, Joint Study Programme of Metropolia UAS and HTW Berlin, 2017.
[13] Kailash Babar, “Government delaying award of Dharavi redevelopment project, alleges bidder: Seclink Tech, the company that emerged the highest bidder, plans to take legal action.” News article: The Economic Times, pg- Politics and Nation, 28 March, 2019.