Typical Challenges Faced In The Slum Transformation Construction Project

[Full Text]

 

AUTHOR(S)

Tejal S. Solanki, Rohit. R. Salgude

 

KEYWORDS

Slum, delay factors, slum transformation, pre-planning stage, construction stage, schedule overrun, capital overrun

 

ABSTRACT

Nowadays, timely completion of the project has become a crucial part in the construction industry. The responsibility of cities is to mobilize in order to improve housing circumstances in slums as a medium of meeting fundamental human needs. Slum areas are highly populated regions created without adequate planning and lacking the key elements of day to day life. The slum rehabilitation is a critical project for any contractor or owner. Generally, consistent delays in the project show up in the preplanning and initial stages of the construction projects, for example, getting the general plans, getting the license, permissions, various legal clearances and so on. The complete construction stage is the shaping phase of any project where numerous unforeseeable events could occur. Lack in determination of the delay factors in the slum transformation project would contribute to the project delays, schedule overrun and capital overruns. This study aims to recognize the possible challenges faced in the construction of a slum rehabilitation project. This study classifies delay factors of the project in different stages i.e., pre-planning and construction stage and proposing a better type of approach to overcome delay related challenges in slum rehabilitation construction project.

 

REFERENCES

[1] Aditi Dinakar, "Delay analysis in construction project", ISSN 2250-2459, International Journal of Engineering Technology and Advanced Engineering, volume 4, issue 5, May 2014, Page No. 784-788.
[2] Amilcar Arantes, Pedro Fernandez, "Delay in construction projects- Causes and impacts", IESM Conference, October 2015.
[3] Anil Upadhyay, Vishant Gupta, Dr. Mukesh Pandey, "A case study on schedule delay analysis in construction projects in Gwalior", International Research Journal of Engineering and Technology, Volume 03, Issue 05, May 2016, Page No. 1312-1315.
[4] Aradhana Rathod, “Delays in Residential Building Construction”, International Journal of Innovative Research & Development, Volume 2, Issue 5, May 2013, Page No. 1908-1922.
[5] Dhanashree S. Tejale, “Analysis of Construction Project Cost Overrun by Statistical Method, International Journal of Advanced Research in Computer Science and Management Studies,Volume 3, Issue 5, May 2015, Page No. 349-355.
[6] Hardik Lokhandwala and Dr. Rajiv Bhatt “Identification of Causes of Delay for Industrial Construction Projects in Indian Context”, Journal of International Academic Research for Multidisciplinary, Volume 2, Issue 12, January 2015, Page No. 379-387.
[7] Hui-Yu Chou and Jyh-Bin Yang, “Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis”, IOP Conf. Series: Materials Science and Engineering 245, 2017.
[8] Jonathan Jingsheng Shi, S. O. Cheung and David Arditi, “Construction Delay Computation Method”, Journal of Construction engineering And Management © ASCE, 2001, Page No. 60-65.
[9] Jyh-Bin Yang and Chih-Kuei Kao, “Review of Delay Analysis Methods: A Process-Based Comparison”, The Open Construction and Building Technology Journal, Volume 3, 2009, Page No. 81-89.
[10] Jyh-Bin Yang and Ming-Kuan Tsai, “Computerizing ICBF Method for Schedule Delay Analysis”, Journal of Construction engineering And Management © ASCE, August 2011, Page No. 583-591.
[11] Kumar Neeraj Jha, Construction Project Management, 2nd ed., Pearson India Education Services Pvt. Ltd., 2005, Page No. 655-662.
[12] Kunal Banthia, Akshay Andure, Shantanu Raj Deshmukh etc., “Statistical Analysis of Delays in Construction Projects”, International Research Journal of Engineering and Technology, Volume 4, Issue 5, May 2017, Page No. 2427-2430.
[13] Ming-Kuan Tsai, Jyh-Bin Yang and Nie-Jia Yau, “Developing Computer-Based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study”, Journal of Civil Engineering and Management, e-ISSN 1392-3730, January 2012, Page No. 823-835.
[14] Meena. V and K. Suresh Babu “Study on Time Delay Analysis for Construction Project Delay Analysis”, International Journal of Engineering and Technology, Volume 4, Issue 3, March 2015, Page No. 1076-1083.
[15] M.Z. Ramli, "Study of factors influencing construction delays at rural area in Malaysia", Journal of Physics, Conf. Series-1049 012017, IOP Publishing-2018.
[16] Nuhu Braimah, “Construction Delay Analysis Techniques - A Review of Application Issues and Improvement Needs”, Buildings ISSN 2075-5309, May 2013, Page No.506-531.
[17] Pablo González, Vicente González, “Analysis of causes of delay and time performance in construction projects", Journal of Construction engineering And Management © ASCE, 2013.
[18] Prakash Kumar, Piyush Raj, "Delay analysis of projects and effects of delays in mining/manufacturing industries", IOSR Journal of Mechanical and Civil Engineering, Volume 12, Issue 6, Nov.-Dec. 2015, Page No.61-71.
[19] Rathod Rajshekhar Gopal, “Planning Scheduling and Delay Analysis- Case Study”, International Advanced Research Journal in Science, Engineering and Technology, Volume 3, Issue 6, June 2016, Page No. 24-28.
[20] Varma Santosh (2014), “Loss in Productivity in Relation with Delay analysis in Building Construction Projects”, IOSR Journal of Mechanical and Civil Engineering, Volume 11, Issue 3, May-June 2014, Page No. 73-80.
[21] Vasilyeva-Lyulina, Masamitsu Onishi and Kiyoshi Kobayashi, “Delay Analysis Methods for Construction Projects: Mathematical Modelling”, International Journal of Transportation, ISSN: 2287-7940, 2015, Page No.27-36.
[22] Vishal Annappa Nimbal and Balasaheb Jamadar, “Planning, Scheduling and Allocation of Resources for Multi-Storied Structure using Oracle’s Primavera P6 Software”, International Research Journal of Engineering and Technology, Volume 7, Issue 7, July 2017, Page No. 2762-2768.