Risk Analysis Of Project Performance At The Development Of High Vehicle Air Transport (SUTT) 150 KV In East Java

[Full Text]

 

AUTHOR(S)

Trijeti, M. Harris Maulana

 

KEYWORDS

Analytical Hierarchy Process; Risk Analysis; Risk Identification

 

ABSTRACT

During SUTT tower construction starting from survey, foundation work, steel installation, tower towing and other, the possibility of risk must exist. These constraints are found both technical and non-technical that can affect the performance of the project. What is discussed is what dominant risks arise that affect the length of time of implementation and how the determination of risk categories and ratios occurring in SUTT development. The purpose of writing is to identify the risk due to the project and analyze the most dominant risk that can affect the implementation time of the project SUTT. Questionnaires were spread to the contractor and analyzed with Analytical Hierarchy Process (AHP) to determine the risk rating, then using risk factors SNI. From interviews with experts, handling responses were obtained for the 3 highest risk ratios: difficult site locations should be made of work paths for material transport and when passing community land must seek permission from the landowner. Bad weather should stop work to keep workers safe and wait for the weather to improve. Socialization of the community by taking a social approach to the local government and community leaders who are in the project environment.

 

REFERENCES

[1] Soeharto, Iman. 2001. Manajemen Proyek. Jakarta: Erlangga.

[2] Soeryani, N. 2004. Analisis Risiko pada Penjadwalan Proyek Jembatan. Tesis, Program Studi Magister Teknik, Program Pascasarjana, Universitas Atma Jaya Yogyakarta, Yogyakarta

[3] Asmarantaka, Nadya Safira. 2014. Analisis Resiko Yang Berpengaruh Terhadap Kinerja Proyek Pada Pembangunan Hotel Batiqa Palembang. Skripsi, Jurusan Teknik Sipil Universitas Sriwijaya Palembang

[4] Burke, R. 2003. Project Manajement: Planning & Control Techniques 4th Edition. the United Kingdom and Australia: John Wiley & Son Ltd.