Design Of An Off Grid Photovoltaic System: A Case Study Of Government Technical College, Wudil, Kano State

[Full Text]

 

AUTHOR(S)

Ishaq M., Ibrahim U.H., Abubakar, H.

 

KEYWORDS

Index terms: Photovoltaic System, Off-grid, Electrical Energy Demand, Cost Estimate, Payback Period

 

ABSTRACT

Abstract: Off-grid (stand-alone) photovoltaic (PV) systems have become widely adopted as reliable option of electrical energy generation. In this paper, the electrical energy demand (load) of the Government Technical College (GTC), Wudil Kano was estimated based on watt-hour energy demands. The estimated load is 48.787 kWh/ day. An off grid PV system was designed based on the estimated load. Based on the equipment selected for the design, 72 PV modules, 20 batteries, a voltage regulators and an inverter will be required to supply the electrical energy demand of the college. The proposed off-grid PV system requires copper wires of cross-sectional areas 1.22 mm2, 32 mm2and 3 mm2 for its installation. The cost estimate of the system N2 124 972 is relatively high when compared to that of fossil fuel generator used by the college. The payback period of the system is estimated to be 2.8 years, which is obviously much shorter than the lifespan of the selected PV modules which is 30 years.

 

REFERENCES

[1]. Messenger and Jerry Ventre, 2000.Photovoltaic System Engineering.CRC Press.

[2]. IEA-PVPS 2000

[3]. Muhammad Modibbo, “Improving Energy Access: Costs and Benefits of Solar PV in Nigeria”. An Article Published by The Mix: Oil and Water, January23, 2012.

[4]. Geographical Information System, Kano University of Science and Technology (GIS, KUST), Wudil

[5]. Sandia,(1995), “Stand-Alone Photovoltaic Systems: A Handbook of Recommended Design Practices”, Sandia National Laboratories Albuquerque New Mexico. PP:1-B53

[6]. Friedrich Sick and Thomas Erge,(1996) “Photovoltaic’s in Buildings-A Design Handbook for Architects and Engineers”,Frieburg Germany.

[7]. Ahmad G E (2002),”Photovoltaic – powered Rural Zone Family House in Egypt” , Renewable Energy, Volume 26, PP: 379-390.

[8]. Clean Energy Council (CEC), “Grid Connected PV Systems Design Guidelines for Accredited Designers” Issue 3 July 2007, Update November 2009.

[9]. Leonics Company Ltd, (2009), “How to Design PV Systems”www.leonicssolar.htm

[10]. Assad Abu-Jasser,(2010), “A Stand Alone Photovoltaic System, Case Study: A Residence in Gaza”, Journal of Applied Sciences in Environmental Sanitation. Vol.5, PP:81-91

[11]. National Electrical Code (NEC, 2005)

[12]. Sun Xtender Batteries, 2009, San Bernardino Road West Covina, CA, 91790 USA www.sunxtender.com

[13]. Raja Rajeswari L., Krishna Bhanu C. V. “Design of Stand-Alone Photovoltaic System”International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 2, March -April 2013, pp510-515

[14]. ENPSonne 180 W,24 V PV Module Manufacturer’s Manual

[15]. CaishengWang, and M. Hashem Nehrir, (2008) “Power Management.