IJSTR

International Journal of Scientific & Technology Research

IJSTR@Facebook IJSTR@Twitter IJSTR@Linkedin
Home About Us Scope Editorial Board Blog/Latest News Contact Us
CALL FOR PAPERS
AUTHORS
DOWNLOADS
CONTACT
QR CODE
IJSTR-QR Code

IJSTR >> Volume 6 - Issue 11, November 2017 Edition



International Journal of Scientific & Technology Research  
International Journal of Scientific & Technology Research

Website: http://www.ijstr.org

ISSN 2277-8616



Relationship Between Time Control And Cost In The Implementation Of Maintenance Project On Harun Nafsi To H.M. Rifadin Street, Samarinda, East Borneo

[Full Text]

 

AUTHOR(S)

Harudi AS, Kustamar, Edi Hargono Dwi Putranto

 

KEYWORDS

cost, project performance, time.

 

ABSTRACT

This research aimed to describe a number of variables relating to the issue and learn about the phenomenon. In this research, the technique used to collect research data was by using questionnaire, as an instrument to answer a set of questions or a written statement from the respondents. Respondents of the research were 100 respondents. Sample determination of the research used purposive sampling method. This research used Structural Equation Modeling (SEM) analysis with Analysis Moment of Structure (AMOS) and Special Package for Statistics Science (SPSS) software. Based on the results of the research, it were obtained 1) project performance has a positive and significant impact on time intensity of road maintenance project, which means if time increases with coefficient of 0.218, it will increase project performance of road maintenance project, 2) project performance has a positive and significant impact on cost of road maintenance project, which means if project performance increases with coefficient of 0.764, it will increase cost of road maintenance project, 3) cost has a positive and significant impact on time intensity of road maintenance project, which means if time increases with coefficient of 0.798, it will increase cost of road maintenance project.

 

REFERENCES

[1] R.H. Clough, G.A. Scars and S.K. Scars, Construction Contracting. New York: John Wiley & Sons Inc, 2006.

[2] G.J. Rits, Total Construction Project Management, Second Edition. LCC, USA: Mac Graw Hill Education, 2013.

[3] S. Carr, Public Space. USA: Cambridge University Press, 2003.

[4] G.D. Oberlender, Project Management for Engineering and Construction. Oklahoma: McGrawHill. 2006.

[5] H. Kerzner, Project Management: A System Approach to Planning, Shedulling and Controlling, Ninth Edition. New Jersey: John and Wiley. Inc., 2006.

[6] I. Suharto, Manajemen Proyek dari Konseptual Sampai Operasional Jilid II. Jakarta: Penerbit Erlangga. 2007.

[7] A. Husen, Manajemen Proyek. Yogyakarta: Penerbit Andi, 2010.

[8] I. Suharto, Manajemen Proyek dari Konseptual Sampai Operasional Jilid I. Jakarta: Penerbit Erlangga, 1995.

[9] I. Dipohusodo, Manajemen Proyek & Konstruksi. Yogyakarta: Kanisius, 2006.

[10] D. Ismawan, Analisis Struktur Jilid 1. Jakarta: PT Gramedia Pustaka Utama, 2001.

[11] A.I. Alamsyah, Rekayasa Jalan Raya. Malang: Universitas Muhammadiyah Malang, 2006.

[12] Sugiyono, Metode Penelitian Bisnis. Bandung: CV. Alfabeta, 2008.

[13] U. Sekaran, Metodologi Penelitian untuk Bisnis, Edisi Kedua. Jakarta: Salemba Empat, 2006.

[14] Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan Kombinasi (Mixed Methods). Bandung: Alfabeta, 2014.

[15] M. Kuncoro, Metode Riset untuk Bisnis & Ekonomi. Jakarta: Penerbit Erlangga. Jakarta, 2009.

[16] R. Romilda, Pengaruh E-Servqual Terhadap Nilai Pelanggan, Kepuasan dan Word of Mouth Communication Anggota Situs Jejaring Sosial Facebook. Unpublished Master Thesis. Program Magister Manajemen: Universitas Udayana Denpasar, 2011.