Analysis Of Factors Causing Delays On Harun Nafsi - Hm Rifadin Street In Samarinda East Kalimantan Maintenance Project

[Full Text]

 

AUTHOR(S)

Fadli, Kustamar, Edi Hargono Dwi Putranto

 

KEYWORDS

Financing, Linear Regression, Project Late Factor, Project Time, Scheduling

 

ABSTRACT

This study aims to identify, analyze, and describe the factors that affect the project maintenance delay on Harun Nafsi - HM. Rifadin Street in Samarinda, East Kalimantan. This research uses qualitative research method by utilizing questionnaires. The 30 participating respondents consist of 14 project implementers and 16 field implementers. The data are analyzed by descriptive statistical technique, factor analysis, and linear regression analysis. The results show that the factors influencing the delay of maintenance project of Harun Nafis - HM Rifadin Street include: (1) time factor and workmanship factor; (2) human resources and natural factors; (3) geographical conditions, late approval, plans change, and labor strikes; and (4) non-optimal working levels and changes in the scope of the project during the work are still ongoing. Based on multiple linear regression analysis, coefficient of determination value of 0.824 is obtained. It means that the four factors studied affect 82.4% of project delays and the rest of 27.6% is influenced by other variables out of this study. The results of this study also indicate that the dominant factor for road maintenance project delays is the fourth factor of the factors mentioned. The effort that the contractor needs to undertake is not to expand the employment contract if the project is underway or the contractor does not have the capability to complete another project.

 

REFERENCES

[1] Ahyari, A. 1987. Manajemen Produksi Pengendalian Produksi. Yogyakarta: BPFE.

[2] Arikunto, S. 2010. Prosedur Penelitian: Suatu Pendekatan Praktek. Jakarta: Rineka Cipta.

[3] Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. 1995. Causes of delayin large building construction projects. J. Manage. Eng., 112,45–50.

[4] Callahan, M. T. 2002. Contrucstion Project Scheduling. New York : MacGraw-Hill

[5] Ervianto, W. I. 2003. Managemen Proyek Kontruksi. Yogyakarta: Andi

[6] Jervis B. M., Levin P. 1988. Construction Proyect Schedulling. New York: Mc Graw Hill.

[7] Levis dan Atherley. 1996. Delay Construction. Langford Santoso, S. 2005. Seri Solusi Bisnis Berbasis TI Menggunakan SPSS untuk Statistik Multivariat. Jakarta: PT Elex Media Komputindo.

[8] Simamora, H. 2007. Manageman Sumber Daya Manusia. Yogyakarta: STIE YKPN

[9] Soeharto, E. 2005. Membangun Masyarakat Memberdayakan Rakyat. Bandung: Refika Aditama.

[10] Sugiyono. 2011. Metode penelitian kuntitatif kualitatif dan R&D. Bandung: Alfabeta.

[11] Zhao, T., dan Tseng, C. L. 2003. A Note on Activity Floats in Activity on Narrow Networks. Journal of the Operational Research Society, 54, 1296-1299.