Analysis Of Scheduling Acceleration Of Worship Building Construction In Dili Timor-Leste Using Time Cost Trade Off (TCTO) Method

[Full Text]

 

AUTHOR(S)

Jaime Ximenes Soares Maia, Lalu Mulyadi, Edi Hargono Dwi Putanto

 

KEYWORDS

acceleration, building, time cost trade

 

ABSTRACT

Planning is the most significant part to achieve success of construction project. The planning itself towards construction project has an impact on revenue in the project itself. Frequently, a project must be completed sooner than its normal time. In this case, the project leader is expected to issue how to accelerate the completion of the project with a minimum cost. The objectives that are expected to achieve from this research are: 1) analyzing the normal time scheduling?, 2) analyzing the scheduling acceleration of the development 3) analyzing changes in the cost increase in development. From the acceleration with time cost trade off (TCTO) method on a worship building project in Dili Timor-Leste, it is optimum to be able to reduce the time duration by adding resources/working groups, and having project cost increase. In the worship building construction project in Dili Timor-Leste, the initial duration of the project is 223 days and it is changed to 181 days, so that there are 34 days of difference from the normal schedule of the project. Where under normal schedule condition, the normal cost obtained is $377.552.868, thus after doing acceleration analysis with time cost trade off (TCTO) method on the project, there is an additional direct cost in the project of $1.123,08 so that the total project cost is $ 378.675,95.

 

REFERENCES

[1] Frederika, A. (2010). Analisis percepatan pelaksanaan dengan menambah jam kerja optimum pada proyek konstruksi. Jurnal, Fakultas Teknik, Universitas Udayana, Denpasar.
[2] Walean, D. M., Mandagi, R. J., Tjakra, J., & Malingkas, G. Y. (2012). Perencanaan dan Pengendalian Jadwal dengan Menggunakan Program Microsoft Project 2010 (Studi Kasus: Proyek PT. Trakindo Utama). JURNAL SIPIL STATIK, 1(1).

[3] Buluatie, 2013. Optimalisasi biaya dan waktu dengan metode time
cost trade off. Tugas Akhir, Jurusan Teknik Sipil Universitas Gorontalo, Gorontalo.

[4] Novitasari, V. (2014). Penambahan jam kerja pada Proyek Pembangunan Rumah Sakit Umum Daerah Belitung dengan Time Cost Trade Off.

[5] Ali, T.H. (1992). Prinsip-Prinsip Network Planning. Jakarta: Gramedia.

[6] Tjaturono, (2008). Manajemen Konstruksi, Bahan Ajar Pascasarjana Teknik Institut Teknologi Malang

[7] Siagian, P. (1987). Penelitian Operasional TeoridanPraktek, Cetakan I, Jakarta: Universitas Indonesia.

[8] Taha, H. A. (1997). Riset Operasional, Jilid 2. Jakarta Barat: Binarupa Aksara.

[9] Radianto. (2008). Metode Penelitian, Bahan Ajar Pascasarjana Magister Teknik Institut Teknologi Nasional, Malang.