Prioritization Of Road Management In District Ogan Komering Ulu Selatan Based On Analytical Hierarchy Process Method
[Full Text]
AUTHOR(S)
Bura Hargi, Mona Foralisa, Betty Susanti
KEYWORDS
Analytical Hierarchy Process, Road Management Priority, Ogan Komering Ulu Selatan
ABSTRACT
Planning of district road management in District Ogan Komering Ulu Selatan has been based on village level board convention called “musrenbang”, ofwhich only a few were accomplished. Government tends to plan road management based on decision making policy, prioritising road management based on intervention policy. The objective of this research was to determine the better prioritization of road management by using analytical hierarchy process method, based on the perceptions of peoplecompetent in road planning, using 5 (five) criteria i.e. road condition, traffic volume, accessibility, policy, and land use. The result of AHP evaluation showed the value of each criteria, with highest value was of road condition criterion( 42.4%) subsequently followed by traffic volume criterion (21.4%), accessibility criterion (12.4%), policy criterion (13.3%) and land use criterion (10.4%). It is concluded that, in the prioritization of road management, there should be a standard of various criteria so that the available budget can be allocated precisely and on target.
REFERENCES
[1] Anonim, 2009, Undang – Undang No. 22 Th. 2009, tentang Lalu Lintas dan Angkutan Jalan Raya, Bappenas, Jakarta.
[2] Antoro, Jatmiko Budi dkk, Penentuan Prioritas Pemeliharaan Jalan Kabupaten Di Wilayah PerkotaanTanjung Redeb, Kabupaten Berau, Jurnal RekayasaSipil/ Volume 10 No.1 – 2016 ISSN 1978 – 5658
[3] Badan Pusat Statistik Kabupaten OKU Selatan, 2017, Ogan Komering Ulu Selatan Dalam Angka, Badan Pusat Statistik Kabupaten ,OKU Selatan.
[4] Dirjen Bina Marga, 1990, Petunjuk Teknis Perencanaan dan Penyusunan Program Jalan Kabupaten, Surat Keputusan No.77/KPTS/Db/1990. Kementrian Pekerjaan Umum, Jakarta.
[5] Krismawati, Natalia Eka Setya, 2014, Analisis Prioritas Penanganan Ruas Jalan Strategis Untuk Pengembangan Wilayah di Kabupaten Demak, Jurnal Wilayah dan Lingkungan Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum, Jakarta
[6] Nugroho, Imam Mardi, 2005, Penetapan Prioritas Pemeliharaan Rutin dan Periodik Jalan Di Sungailiat Kab. Bangka Menggunakan Metode Proses Hirarki Analitik (PHA),Tesis. Pascasarjana Universitas Sriwijaya.Palembang.
[7] Saputro, Dian Agung, 2011, Evaluasi Kondisi Jalan dan Pengembangan Prioritas Penanganannya (StudiKasus di KecamatanKepanjenKabupaten Malang), Jurnal Teknik Sipil, Fakultas Teknik, Universitas Brawijaya, Malang.
[8] Syawal, Agustinus, 2013, Perbandingan Skala Prioritas Penanganan Jalan Di Kabupaten Bengkayang Antara Metode AHP Dengan Metode Bina Marga, Jurnal Teknik Sipil UNTAN, Volume 13 Nomor 2 – Desember.
|