Application Of Materials Management Construction Project (Case Study In Central District Sumba)
[Full Text]
AUTHOR(S)
Agus Bambang Siswanto, Kemmala Dewi, Hari Setijo Pudjihardjo, Aris Krisdiyanto, Edwyn Boloe
KEYWORDS
Materials management, constraints, impact, solutions, contracting, construction service, Sumba
ABSTRACT
The application of good management and proper materials are very useful for the smooth running of a construction project .. This study aims to determine the inhibiting factors, the impact and the best solution application materials management problems in Central Sumba Regency in addition to determine the quality of construction management in the region.
This research was conducted by distributing questionnaires to companies contracting in Central Sumba District. Then the data is analyzed to obtain an average value (mean) and standard deviation values (standard deviation). The analysis is the analysis of the range of average value (mean range analysis), analysis of the rating value of the average (mean rank analysis) and the value of regression
Based on the survey results revealed that the main obstacle in the implementation of material management in Central Sumba District is the geographic location that requires the distribution of the material relied on maritime transport impact on the delivery time becomes longer, in addition to the means of transport and the selection of suppliers of material can also be an obstacle to the management of materials in the District Central Sumba. Although there are these constraints but based on the results of the analysis of data processing with an average range of values (mean range analysis) can be seen that the application of material management in Central Sumba Regency already well underway.
based research note value regression
Y = 1.827 - 0,135X1 + 0,359X2 + 0,296X3
If the reduction constraints (X1), the increasing impact of (X2) and the solution (X3), the application of the material management would be much better
REFERENCES
[1] Barrie, D.S, Boyd C. Paulson, “Manajemen Konstruksi Profesional,†terj Sudinarto, (Jakarta : Erlangga, 1984)
[2] Bell, L. Stukhart, G, “Cost and Benefit of Materials Management System,†University of Texas at Austin, 1986
[3] Ervianto, W. I., “Teori – Aplikasi ManajemenProyek Konstruksi â€, (Yogyakarta : PT. Andi, 2007)
[4] Gray, Clive; dkk. “Pengantar Evaluasi Proyek,†Edisi Kedua, (Jakarta : PT. Gramedia Pustaka Utama, 1993)
[5] Johnston, J. E., “Site Control of Material Handling, Storage, and Protection,†Butterworths, London, 1981
[6] Paulus Nugraha, Ishak Natan, R. Sutjipto, “Manajemen Proyek Konstruksi 1,†Kartika Yudha, 1985
[7] Plossl, G. W., “Materials Requirements Planning,†McGraw-Hill, New York, 1994, pg 74-75
[8] PMBOK, P. M. F. C, “Labor, Material and Equipment Utilizationâ€, http//www.ce.cmu.edu, 2002
[9] Siswanto, A. B., et. All. “Analysis of Implementation of Standard Operating Procedure Execution Management System K3 on Toll Roads Development to Prevent Accidents Happen in Pasuruan - Probolinggo, East Javaâ€, International Journal of Civil Engineering and Technology, 9(11), 2018, pp. 580–587
[10] Stonebraker, et. all. “Operations Strategy,†Massaachusetts, Allyn and Bacon, 1994
[11] Stukhart, G., “Construction Materiials Management,†(New York, Marcel Dekker, Inc,1995)
[12] Thomasonan Lutfie, Agus B Siswanto, Rahma Nindya A, and Pipit Skriptiana P, Dredging is a Work to Change the Basic Form of Water, Towards Shipping
Safety, International Journal of Civil Engineering and Technology, 9(10), 2018, pp. 2043–2053.
|