The Effect Of Project Manager's Competence And Leadership To Project Performance On Industrial Construction Projects
[Full Text]
AUTHOR(S)
Syafwandi, Agus Suroso, Rizal Sugih Firmansyah
KEYWORDS
Competency, Industrial Construction Project, Leadership, Project Manager, Project Performance
ABSTRACT
The rapid development of industry in Indonesia indirectly has an impact on the number of construction projects in the industrial area of Bekasi such as factory buildings, warehouses, offices, hotels, and hospitals. This research focuses on the influence of leadership and competence of project manager to project performance in industrial construction project. To find the effect of leadership and competence of project manager to project performance can be done with SEM PLS algorithm. The result show that leadership and competence of project manager has significant effect to project performance.
REFERENCES
[1] Kendra, K. A. and L. J. Taplin. 2004. Change Agent Competencies for Information Technology Project Managers. Consulting Psychology Journal: Practice and Research, 56(1): 20-34.
[2] Anantatmula, V. S. 2010. Project manager leadership role in improving project performance. EMJ - Engineering Management Journal 22(1): 13–22.
[3] Nixon, P., M. Harrington, and D. Parker. 2012. Leadership performance is significant to project success or failure: a critical analysis. International Journal of Productivity and Performance Management 61: 204-216.
[4] Belassi, W. and O. I. Tukel. 1996. A New Framework for Determining Critical Success/Failure Factors in Projects. International Journal of Project Management 14(3): 141-151.
[5] Abushaban, S. S. 2008. Factors Affecting the Performance of Construction Projects in The Gaza Strip. Thesis, The Islamic University of Gaza, Construction Management, Palestine.
[6] Brahmantariguna, A. A., G. C. Dharmayanti, and I. W. Yansen. 2016. Hubungan Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung. Jurnal Spektran 4(2).
[7] Pastiarsa, M. 2015. Manajemen Konstruksi Bangunan Industri Perspektif Pemilik Proyek. Yogyakarta: Teknosain.
[8] Perrenoud, P. (1997). Differentiated Pedagogy, from Intentions to Action. Paris: ESF.
[9] Dziekoński, K. 2017. Project Managers’ Competencies Model for Construction Industry in Poland. Procedia Engineering 182: 174 – 181.
[10] Hersey, P. and K. H. Blanchard. 1982. Management of Organizational Behavior. Utilizing Human Recource. New Jersey: Prentice – Hall.
[11] Dulewicz, V., M. Higgs, and M. Slaski. 2003. Measuring emotional intelligence: Content, construct, and criterion-related validity. Journal of Managerial Psychology 18(5): 405–420.
[12] Partington, A. .2003. The Linguistics of Political Argument. London: Routledge.
[13] Choudry, R., A. Nasir, and H. Gabriel. 2012. Cost and Time Overruns in Highway Projects in Pakistan. Pakistan Engineering Congress, Centenary Celebration Proceedings, 353-369.
[14] Sarstedt, M., C. M. Ringle, D. Smith, R. Reams, and J. F. Hair. 2014. Partial Least Squares Structural Equation Modeling (PLS-SEM): A Useful Tool for Family Business Researchers. Journal of Family Business Strategy 5(1): 105-115.
|